लॉग इन करा
Hengistbury Head long groyne work will cost £10m, Hengistbury Head, Dorset, UK - 25 Nov 2023
Hengistbury Head long groyne work will cost £10m, Hengistbury Head, Dorset, UK - 25 Nov 2023
Hengistbury Head long groyne work will cost £10m, Hengistbury Head, Dorset, UK - 25 Nov 2023
Hengistbury Head long groyne work will cost £10m, Hengistbury Head, Dorset, UK - 25 Nov 2023
Hengistbury Head long groyne work will cost £10m, Hengistbury Head, Dorset, UK - 25 Nov 2023
Hengistbury Head long groyne work will cost £10m, Hengistbury Head, Dorset, UK - 25 Nov 2023
Hengistbury Head long groyne work will cost £10m, Hengistbury Head, Dorset, UK - 25 Nov 2023

14230057h

14230057h
14230057a
प्रतिमा वर्णन

स्टॉक प्रतिमा ID: 14230057a

Hengistbury Head long groyne work will cost £10m, Hengistbury Head, Dorset, UK - 25 Nov 2023

Replacing a long groyne along Bournemouth's coastline will cost around £10m. Work to replace the long groyne at Hengistbury Head has been given the green light and will help manage the flood risk for 5,800 homes in Bournemouth. The existing groyne, built in the 1930s and in "poor condition", is soon to be ripped out and replaced with a new armour stone and pre-cast concrete groyne 150 metres long.

महत्वाची माहिती

प्रतिमा स्वरूप

  • 5472 × 3648 पिक्सेल्स • JPG

प्रतिमा योगदानकर्ता

Geoffrey Swaine/Shutterstock

© 2003-2024 Shutterstock, Inc.