Přihlásit se
U.S. Army Construction of JLOTS Pier Completed in Mediterranean Off Coast of Gaza - 16 May 2024
U.S. Army Construction of JLOTS Pier Completed in Mediterranean Off Coast of Gaza - 16 May 2024
14485827b
Snímek Popis

Stock Snímek ID: 14485827b

U.S. Army Construction of JLOTS Pier Completed in Mediterranean Off Coast of Gaza - 16 May 2024

U.S. Army Soldiers assigned to the 7th Transportation Brigade (Expeditionary), U.S. Navy Sailors assigned to Amphibious Construction Battalion 1, and Israel Defense Forces emplace the Trident Pier on the Gaza coast, on Thursday, May 16, 2024. The temporary pier, part of the Joint Logistics Over-the-Shore (JLOTS) capability, will enable the maritime delivery of international humanitarian aid to the United Nations in Gaza for distribution to Palestinian people in need. Photo via U.S. Central Command/UPI

Důležité informace

Snímek Formáty

  • 4000 × 2667 pixelů • JPG

Snímek Přispěvatel

u s Central Command/UPI/Shutterstock

© 2003–2024 Shutterstock, Inc.