Connexion
San Pablo City, Laguna, Philippines - February 26, 2018: Electrical Workers On Telehandler With Bucket installing High tension wires on high concrete post. Underside view low angle
San Pablo City, Laguna, Philippines - February 26, 2018: Electrical Workers On Telehandler With Bucket installing High tension wires on high concrete post. Underside view low angle
San Pablo City, Laguna, Philippines - February 26, 2018: Electrical Workers On Telehandler With Bucket installing High tension wires on high concrete post. Underside view low angle
Tel Aviv, Israel - 05 31 2018: Loud spekers at the beach in Tel Aviv
Very expensive and technological surveillance system installed on a lamppost in the city center, vertical panorama, Kiev, Ukraine - August 26 2019
MISSISSAUGA CANADA - MAY 25, 2018:  Satellite transmitter, antenna and satellite dish used for remote broadcast or electronic field production at locations outside regular television studio
ZICHRON YAAKOV, ISRAEL - MAY 20: Electronic observation system in the 3rd International Fire Conference, May 20th, 2014

6412589

Afficher plus de vidéos

1007963962
Vidéo Description

Numéro de la ressource de stock de type Vidéo : 1007963962

San Pablo City, Laguna, Philippines - February 26, 2018: Electrical Workers On Telehandler With Bucket installing High tension wires on high concrete post. Underside view low angle

Informations importantes

Formats Vidéo

  • HD • 1920 × 1080 pixels • MP4

  • SD • 852 × 480 pixels • MOV

  • Web • 426 × 240 pixels • MOV

Fréquence d’images

  • 29.97 IPS

Durée

  • 0:10

Contributeur Vidéo

Rey BorlazaRey Borlaza

© 2003 -2024 Shutterstock, Inc.