Connexion
Dzerzhinsk, Russia, June 3, 2022. Loading of a chemical reactor in a port terminal using a gantry crane on a three-axis conveyor
Dzerzhinsk, Russia, June 3, 2022. Unloading of a chemical reactor in a port terminal using a gantry crane, lifting equipment to the port of Dzerzhinsk
Dzerzhinsk, Russia, June 3, 2022. Loading of a chemical reactor in a port terminal using a gantry crane on a three-axis conveyor
Dzerzhinsk, Russia, June 3, 2022. Loading of a chemical reactor in a port terminal using a gantry crane on a three-axis conveyor
Dzerzhinsk, Russia, June 3, 2022. Loading of a chemical reactor in a port terminal using a gantry crane on a three-axis conveyor
San Esteban, Lugo, Spain; 06-09-2022: Freight train with a locomotive of the Renfe company at the head towing wagons of dangerous products entering the Santo Estevo do Sil train station
KAZAN, TATARSTAN/RUSSIA - MARCH 09 2015: Large gas and oil refinery metal tower on transporting platform at plant construction

29216473

Afficher plus de vidéos

1091031695
Vidéo Description

Numéro de la ressource de stock de type Vidéo : 1091031695

Dzerjinsk, Russie, 3 juin 2022. Chargement d'un réacteur chimique dans un terminal portuaire à l'aide d'une grue de portique sur un convoyeur à trois axes

Informations importantes

Formats Vidéo

  • 4K • 3840 × 2160 pixels • MP4

  • HD • 1920 × 1080 pixels • MOV

  • SD • 852 × 480 pixels • MOV

  • Web • 426 × 240 pixels • MOV

Fréquence d’images

  • 25 IPS

Durée

  • 0:33

Contributeur Vidéo

a.z.videoa.z.video

© 2003 -2024 Shutterstock, Inc.