ログイン
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024

14450901h

14450901h
14450901c
画像の説明

画像素材ID: 14450901c

FPSO Completed in Qingdao, China - 26 Apr 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.

重要情報

画像フォーマット

画像の寄稿者

© 2003-2024 Shutterstock, Inc.