లాగిన్ చేయి
Work on the support of the high-voltage power line
KUALA LUMPUR, MALAYSIA NOVEMBER 25 2018 : Installation of New National Grid, The Grid Code is a set of technical regulations used by utility companies such as Tenaga Nasional Berhad (TNB) in Malaysia.
Kuala Lumpur, Malaysia - December 15, 2018: Unidentified linesman, or riggers working at height on transmission electricity tower pylon during bright day light.
Minsk, Belarus - Aug 9, 2018: A team of workers in uniform wears time at the top of an electric tower against the background of the blue sky.
KUALA LUMPUR, MALAYSIA NOVEMBER 25 2018 : Installation of New National Grid, The Grid Code is a set of technical regulations used by utility companies such as Tenaga Nasional Berhad (TNB) in Malaysia.
KUALA LUMPUR, MALAYSIA NOVEMBER 25 2018 : Installation of New National Grid, The Grid Code is a set of technical regulations used by utility companies such as Tenaga Nasional Berhad (TNB) in Malaysia.
Kuala Lumpur, Malaysia - December 15, 2018: Unidentified linesman, or riggers working at height on transmission electricity tower pylon during bright day light.

1022068714

మరింత ఫుటేజీని చూడండి

1029746027
వీడియో వివరణ

స్టాక్ వీడియో ID: 1029746027

Kimanis, Papar, Sabah, Malaysia- May 2019 : A worker painting the electric tower look at the camera and show hand thumbs up.

ముఖ్యమైన సమాచారం

వీడియో ఫార్మాట్‌లు

ఫ్రేమ్ రేట్

  • 29.97fps

వ్యవధి

  • 0:09

వీడియో సహకారి

AwgJoAwgJo

© 2003-2024 Shutterstock, Inc.