Đăng nhập
KAZAN, TATARSTAN/RUSSIA - APRIL 04 2018: Skilled workers control long drilling pipes transported by powerful crane platform against cloudy sky on April 04 in Kazan
Batman / Turkey - May 25, 2015: Oil drilling rig workers. The workers are digging wells to the depth of hundreds of meters with this tower.
KELANTAN, MALAYSIA - APRIL 10, 2019 : An abseiler complete with personal protective equipment (PPE) hanging at the edge of oil and gas rig platform for touch up painting activities.
KELANTAN, MALAYSIA - OCT 18th 2021: Unidentified scaffold erector team performed manual transfer scaffolding materials in the process plant area.
KAZAN, TATARSTAN/RUSSIA - APRIL 17 2018: Worker in uniform and helmet controls with levers pipe installation on huge oil exploratory drilling machine under grey sky on April 17 in Kazan
Batman / Turkey - May 25, 2015: Oil drilling rig workers. The workers are digging wells to the depth of hundreds of meters with this tower.
KAZAN, TATARSTAN/RUSSIA - APRIL 17 2018: Employees in uniform connect thick hose to valve on exploratory drilling machine against special car at prospecting site on April 17 in Kazan

1014337544

Xem video khác

1014337547
Mô tả Video

ID Video có sẵn: 1014337547

KAZAN, TATARSTAN/RUSSIA - APRIL 17 2018: Laborers in uniform with company logo take rusty pipe and mount to exploratory drilling machine on prospecting site on April 17 in Kazan

Thông tin quan trọng

Định dạng Video

  • 4K • 3840 × 2160 pixel • MOV

  • HD • 1920 × 1080 pixel • MOV

  • SD • 852 × 480 pixel • MOV

  • Chất lượng web • 426 × 240 pixel • MOV

Tốc độ khung hình

  • 25fps

Thời lượng

  • 0:12

Người đóng góp Video

OKIOKIOKIOKI

© 2003-2024 Shutterstock, Inc.