Bejelentkezés
(Time-lapse) Barge mounted cranes work on construction of the new Tappan Zee Bridge as traffic crosses the existing Tappan Zee Bridge on September 15, 2015 in Tarrytown.
(Time-lapse/Panning) Barge mounted cranes work on construction of the new Tappan Zee Bridge as traffic crosses the existing Tappan Zee Bridge on September 15, 2015 in Tarrytown.
Barge mounted cranes work on construction of the New Tappan Zee Bridge as traffic crosses the old bridge over the Hudson River between Westchester and Rockland counties.
Barge mounted cranes work on construction of the New Tappan Zee Bridge as traffic crosses the old bridge over the Hudson River between Westchester and Rockland counties.
TARRYTOWN, NY - SEPTEMBER 15: A pleasure boat passes as cranes work on the New Tappan Zee Bridge over the Hudson River between Westchester and Rockland counties on September 15, 2015 in Tarrytown.
TARRYTOWN, NY - MAY 2: (Timelapse) Barges and cranes on the Hudson River, under the existing Tappan Zee Bridge, lay the pilings for the foundation of the new bridge on May 2, 2014 in Tarrytown.
TARRYTOWN, NY - MAY 2: Barges and cranes on the Hudson River, under the existing Tappan Zee Bridge, help to lay the pilings for the foundation of the new bridge on May 2, 2014 in Tarrytown.

6236591

További videók megtekintése

11728460
Videó leírása

Stock Videó azonosító: 11728460

(Time-lapse/Zoom-in) Az uszályra szerelt daruk az új Tappan Zee híd építésén dolgoznak, mivel a forgalom átlépi a meglévő Tappan Zee hídot 2015. szeptember 15-én Tarrytownban.

Videó Formátumok

Képsebesség

  • 29.97 kép/s

Időtartam

  • 0:15

Videó Feltöltő

CCHP Media

© 2003-2024 Shutterstock, Inc.