Conectează-te
(Time-lapse) Barge mounted cranes work on construction of the new Tappan Zee Bridge as traffic crosses the existing Tappan Zee Bridge on September 15, 2015 in Tarrytown.
(Time-lapse/Panning) Barge mounted cranes work on construction of the new Tappan Zee Bridge as traffic crosses the existing Tappan Zee Bridge on September 15, 2015 in Tarrytown.
Barge mounted cranes work on construction of the New Tappan Zee Bridge as traffic crosses the old bridge over the Hudson River between Westchester and Rockland counties.
Barge mounted cranes work on construction of the New Tappan Zee Bridge as traffic crosses the old bridge over the Hudson River between Westchester and Rockland counties.
TARRYTOWN, NY - SEPTEMBER 15: A pleasure boat passes as cranes work on the New Tappan Zee Bridge over the Hudson River between Westchester and Rockland counties on September 15, 2015 in Tarrytown.
TARRYTOWN, NY - MAY 2: (Timelapse) Barges and cranes on the Hudson River, under the existing Tappan Zee Bridge, lay the pilings for the foundation of the new bridge on May 2, 2014 in Tarrytown.
TARRYTOWN, NY - MAY 2: Barges and cranes on the Hudson River, under the existing Tappan Zee Bridge, help to lay the pilings for the foundation of the new bridge on May 2, 2014 in Tarrytown.

6236591

Vezi mai mult conținut video

11728460
Video Descriere

Video de stoc, ID: 11728460

Macaralele montate pe barje lucrează la construirea noului pod Tappan Zee pe măsură ce traficul traversează podul Tappan Zee existent pe 15 septembrie 2015 în Tarrytown.

Formate pentru Video

Frecvență cadre

  • 29.97 fps

Durată

  • 0:15

Colaborator pentru Video

CCHP Media

© 2003-2024 Shutterstock, Inc.