Σύνδεση
demolition machine destroying structure
Head of Pile Driver Machine Drill at Building Construction Site or Oil and Gas Drilling Site
Head of Pile Driver Machine Drill at Building Construction Site or Oil and Gas Drilling Site
The upper part of the drilling machine for the Geology of the soil. Winch up auger for geological engineering surveys. The lifting part on the background of blue sky
Wet Cement Pump Machine Concrete Spraying Arm In Building Site.
Pillar driving of hydraulic drilling or hammer machines on construction site. Worker operate pillars machine. Building solar power station.
Telescopic boom of a construction crane. Mobile crane with hook and straps is raising work platform, basket.

3434584657

Δείτε περισσότερα βίντεο

3509575323
Περιγραφή για Βίντεο

Κωδικός για Βίντεο στοκ: 3509575323

Head of Pile Driver Machine Drill at Building Construction Site or Oil and Gas Drilling Site

Μορφές για Βίντεο

  • 4K • 3840 × 2160 pixel • MOV

  • HD • 1920 × 1080 pixel • MOV

  • SD • 852 × 480 pixel • MOV

  • Web • 426 × 240 pixel • MOV

Ρυθμός καρέ

  • 29.97 FPS

Διάρκεια

  • 0:08

Συνεργάτης για Βίντεο

moomin201moomin201

© 2003-2024 Shutterstock, Inc.