登入
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024
FPSO Completed in Qingdao, China - 26 Apr 2024

14450901h

14450901h
14450901f
圖片 說明

素材 圖片 編號: 14450901f

FPSO Completed in Qingdao, China - 26 Apr 2024

The Haikui No. 1 Floating Production, Storage, and Offloading Unit (FPSO) is being completed at Offshore Oil Engineering (Qingdao) Co., LTD., in Qingdao, China, on April 26, 2024. Known as the ''Super Energy Bowl,'' the ''Anemone 1'' has a maximum displacement of 100,000 tons, a maximum oil storage capacity of 60,000 tons, and can continuously operate at sea for 15 years without docking. Reports indicate that ''Haikui No. 1'' is the first cylindrical FPSO to be applied to Asian waters and will be used in the Liuhua oilfield in the Pearl River Estuary basin.

重要資訊

圖片 格式

圖片 投稿人

Costfoto/NurPhoto/Shutterstock

© 2003-2024 Shutterstock, Inc.